Every tooling quote is the sum of three things: the tool structure (does this mold reliably produce the part), the steel and heat treatment (how many shots before it fails), and the machining (how accurately the cavity is cut and how well it is measured). A quote that bundles these into one number and refuses to break them out is a quote you should ask questions about.
A single-cavity tool is the cheapest and is often the correct answer. Cavity count should follow annual demand, not ambition: if you need 50,000 parts a year, a 1×1 tool running two shifts covers it, and a 1×4 tool just doubled your tooling spend for capacity you will not use until year three. Two-plate designs also avoid the runner system a three-plate design needs.
This is the single most expensive variable and the easiest to design out. Every side core, lifter or slide adds not only machining but design time, fitting, and a maintenance item that wears. Moving one side hole to a through-hole, or adjusting a draft angle so a feature can be formed by the parting line itself, can remove 20–30% from a tool price with no loss of function. It is the most effective cost lever available to a product engineer, and it must be applied before the drawing is frozen.
For zinc alloy, die surface temperatures sit around 400–450°C; pre-hardened or hardened H13 (DIN 1.2344) is sufficient and standard. Aluminum and magnesium run hotter and justify premium hot-work grades with nitriding. Putting a premium grade in a small hardware fitting tool is money burned. Putting a general-purpose cold-work steel in an aluminum die is a tool that will fail early under thermal fatigue, and the failure will be blamed on the die caster rather than the specification.
"How many shots do you need?" is a question that changes the answer substantially, and it is frequently left blank. A tool specified for 300,000 shots and one specified for 1,000,000 shots differ in steel grade, heat treatment cycle, insert strategy and even whether critical details are replaceable inserts or cut directly into the block. If the target is not stated, the supplier will assume — usually downward, because that is what wins on price.
"±0.02 mm on everything" is a cost, not a plan. A drawing that identifies the four or five features that actually matter and leaves the rest at general tolerance is both cheaper and more manufacturable. The features that matter usually interact with another component — a bearing bore, a mating face, a latch — and those are the ones worth tightening.
First article report only, versus first article plus CMM dimensional reports on production lots, versus full SPC data with each shipment, are three different commercial offers. In automotive and telecom supply chains the third is often mandatory, and it carries a real cost in equipment time and engineering hours. It should be priced visibly rather than discovered later.
With those seven items, a quote is usually a firm number rather than a range. Without them, any supplier who gives you a precise figure is guessing and hoping you do not notice.
Tooling cost is largely insulated from metal price, but part price is not. Through 2026, zinc and aluminum ingot prices have moved enough that most die casters quote per-part pricing as base metal + conversion, with a defined repricing window. When comparing part prices between suppliers, confirm whether the conversion component is locked for a stated period — otherwise a lower unit price can simply be a shorter price guarantee.
Send it and we will come back with a quote that states its assumptions: cavity count, steel grade, tool life, and inspection scope. If we think a feature should change to reduce cost, we will say so in the same message rather than after the tool is built.