Sixteen Things to Fix Before the Tool Is Cut

Kexin Engineering · Updated 2026-11-14 · 10 min read · Print-friendly

Every item below costs money in one of two places: in the tool, if you fix it after the drawing is frozen, or in mass production, if you never fix it. The list is ordered roughly by how much a late change hurts. Run it against your drawing while the drawing is still soft — that window closes the day the steel is ordered.

1. The checklist

#CheckRule of thumbCost of ignoring it
1Wall thickness uniformity Keep walls as even as possible. Zinc: 0.6–3.0 mm typical, 0.5 mm minimum in small areas. Aluminum: 1.0–1.5 mm typical minimum. Avoid isolated thin islands surrounded by thick sections. Thick-to-thin transitions create shrinkage porosity and sink marks. The part passes first article and fails leak or cosmetic inspection in month three.
2Draft angle Outer walls: 1° minimum, 2° preferred. Inner walls (cores): 1.5–2° minimum, because the part shrinks onto the core. Add 1° more on textured surfaces per 0.025 mm of texture depth. Insufficient draft means drag marks, galling, and parts that stick. Fixing it in the tool means re-cutting the cavity — the most expensive kind of change.
3Fillets and radii Inner corner radius ≥ wall thickness. Outer radius = inner radius + wall thickness. Never a sharp internal corner. Sharp internal corners are stress concentrators and hot spots. They crack in service and they erode the die locally, so the corner rounds off over the tool's life and the part drifts.
4Undercuts and side actions Count every side hole, side recess and reverse-angle feature. Each one is a slide, a lifter or a split — a design cost, a machining cost and a maintenance item. One slide typically adds a substantial fraction to tooling cost and adds an ongoing wear item. The cheapest slide is the one designed out before the drawing is frozen.
5Parting line placement Put the parting line on a non-cosmetic face, or hide it on an edge, a step or a texture break. Never across a visible flat surface. A parting line on a visible face means polish flash removal on every part forever, and a visible witness line the customer will reject.
6Rib thickness Rib thickness ≤ 0.6 × adjoining wall. Rib spacing ≥ 2 × wall. Rib depth ≤ 3 × wall where possible. Ribs as thick as the wall create a heavy mass at the intersection — sink on the opposite face, porosity inside, and a part that looks defective even when it is structurally fine.
7Boss design Boss outside diameter ≈ 2 × inside diameter. Connect bosses to walls with a gusset or a rib. Isolated bosses are the worst case. A thick isolated boss is a shrinkage cavity generator. The thread strips or the boss cracks — and it will be found by the end user, not by your incoming inspection.
8Cored holes Core pins smaller than about 1.5 mm in zinc or 2.5 mm in aluminum are fragile. Hole depth should not exceed roughly 3× the hole diameter; beyond that, drill it after casting. A thin long core pin bends, breaks and washes out. Every broken pin is a tool stop. Casting a hole too deep is often slower and more expensive than a second operation.
9Threads Cast threads are workable in zinc for coarse pitches; in aluminum prefer a cored hole plus a cut or formed thread. Cast thread depth should not exceed about 2× diameter. A cast thread that is slightly undersized cannot be rescued — the part is scrap. A machined thread is repeatable and inspected with a gauge.
10Machining allowance Where a face will be machined, leave 0.3–0.5 mm of stock. State the datum for the machined face. No allowance means the machined face breaks through into porosity. Too much allowance means an interrupted cut and chatter.
11Flatness and warp Specify flatness on the faces that matter, not on the whole part. Large flat areas warp; a rib or a slight crown controls it. "Flat within 0.05 across the whole part" on a large thin casting is a specification the process cannot meet, so every lot is a negotiation.
12Ejector pin marks Name the faces where an ejector witness mark is acceptable. Usually the non-cosmetic side. Ejector marks on a visible face are a permanent cosmetic defect. The ejector layout is fixed in the tool, so this is decided at design, not at production.
13Gate location and flow length Ask where the gate will be and how far the metal has to travel. Long thin flow paths need higher pressure and hotter metal. A gate in the wrong place produces a cold shut or a weld line exactly on the cosmetic face. Moving a gate usually means re-cutting the runner, not the cavity — but it still costs a tool revision.
14Text, logos and part numbers Cast-in text: 0.4 mm minimum stroke width, 0.3–0.5 mm depth, with draft on the letter walls. Below that, use laser marking instead. Text too shallow disappears; text too deep sticks in the die and tears. Both are found at first article, after the cavity is cut.
15Tolerance philosophy Tighten the four or five features that mate with something else. Leave the rest at a general tolerance. State the datum scheme. "±0.02 on everything" prices the part as if every surface were critical, and it is usually not achievable as-cast anyway — so it converts into a permanent concession discussion.
16Assembly and mating features Define the mating part, the clearance, and which side owns the tolerance. Snap fits need a designed-in preload, not a nominal fit. A snap fit that works in the sample and fails in the field is a tool change plus a product recall, and the root cause is a missing stack-up calculation.

2. The three that account for most late changes

In our experience the ranking is stable across projects: draft, undercuts, and wall thickness transitions. Draft and undercuts are structural — they mean re-cutting steel. Wall transitions are the sneaky one, because a thick-to-thin step looks harmless in CAD and only reveals itself as porosity after the first production run.

If you have twenty minutes and can only check three things, check those.

3. How to read a drawing for DFM in ten minutes

  1. Look for the thinnest section. If it is under 1 mm in aluminum or under 0.5 mm in zinc, flag it immediately — everything downstream depends on whether that section can be filled.
  2. Look for undercuts. Any feature that cannot be released in the opening direction is a slide. Count them.
  3. Look for sharp internal corners. Every one of them is a fillet you will be asked to add later.
  4. Look at the tolerance block. If it says ±0.02 general, that is a conversation about which four dimensions actually matter.
  5. Look at the cosmetic callout. If there is no explicit A-surface definition, ask which face the customer will look at. It determines the parting line, the gate and the ejector layout at once.

4. What a DFM review from us contains

Send a 3D file and the review comes back within 24 hours with:

• every feature we would change, with the reason and the estimated effect on tool cost or part cost;
• the proposed cavity count and its justification against your stated volume;
• the proposed parting line and gate location, marked on a screenshot;
• any tolerance on the drawing that we believe the process cannot hold, and what we would propose instead;
• features we would leave exactly as drawn, so you know what was reviewed and accepted rather than skipped.

We do not charge for this, and it comes before any commitment. A DFM comment that arrives after the tool is cut is not advice — it is an invoice.

5. What DFM cannot fix

DFM reduces manufacturing risk. It does not fix a product design problem. If a latch is under-strength because the wall it sits on is too thin for the load, the right answer may be a different material, a different assembly, or a different part — not a better casting.

We will say that when we see it. A supplier who approves every drawing is not reviewing it.

6. Print it and use it

This page prints without the navigation and call-to-action blocks. Use it as a review sheet: one column for the drawing revision, one for the engineer's initials, one for the decision (change / accept / machine later). The value is not in the list — it is in the fact that somebody signed each line before the steel was ordered.